water boiler for aac block drying
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Dec 14, 2018 · Water Supply 1371-1638. 19. Drainage 1639-1740 0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 3000 drying, mixing and Asphalt Get Price
Jan 27, 2018 · We were able to provide all our hot water and heat over 3000 sq.ft. of living space with a 46 gallon Combi-Cor water heater. (Combi-Cor heater is a water heater with built in heat exchanger for space heating.) In 2013 our Combi-Cor died. We replaced the Combi-Cor water heater with a boiler system because it has a longer estimated lifespan.Get Price
Jan 27, 2018 · We were able to provide all our hot water and heat over 3000 sq.ft. of living space with a 46 gallon Combi-Cor water heater. (Combi-Cor heater is a water heater with built in heat exchanger for space heating.) In 2013 our Combi-Cor died. We replaced the Combi-Cor water heater with a boiler system because it has a longer estimated lifespan.Get Price
Dec 14, 2018 · Water Supply 1371-1638. 19. Drainage 1639-1740 0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 3000 drying, mixing and Asphalt Get Price
0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00 0002 Hire charges of Concrete drying, mixing and Asphalt 300.00 0056 Tandem Road Roller hour 1200.00 0057 Water Tanker 5 to 6 KL capacity hour 200.00 0058 Air compressor hour 200.00 0059 Wet Mix Plant 60 Get Price